Contents

1.All material should be quality check before get into the stock so that we can make sure all wire harness and cable assembly use the right thing.

2.Our IPQC guys will check during the full processing to find any defeat.

3.All complete goods should be break-over and color tested for each one with the drawing.

4.QC guys will recheck custom wire harness and custom cable assembly about the measure, color, wire and connector model again by drawing in hand.

5.OQC final check before mass product be packed. 
                           

Contents